BikepackPilot

North Sea Cycle Route (EuroVelo 12): bikepacking plan & riding days

EuroVelo 12 is a signposted circuit around the North Sea coast, linking Norway, Sweden, Denmark, Germany, the Netherlands, Belgium, France and the UK. It is billed as the longest signposted cycle route in the world.

Good conditions68.3riding daysno wind, no rain, mild temperature
Tough conditions99.7riding daysmoderate headwind and light rain on every segment

Estimate from BikepackPilot's model: base pace 110 km/day on asphalt, adjusted per 50 km segment for surface, wind and rain. Rest days not included. Your own numbers will differ – that's what the app is for.

Route map

Route line from OpenStreetMap, simplified – for planning, not navigation. Data © OpenStreetMap contributors (ODbL). Map style: CyclOSM.

Key facts

Distanceabout 7,250 km on the current official EuroVelo listing (older sources say about 6,000 km or 5,942 km)
StartBergen, Norway (circuit; start point is arbitrary)
FinishBergen, Norway (circuit; the route links to Orkney and Shetland, with a ferry to Norway)
CountriesNorway, Sweden, Denmark, Germany, Netherlands, Belgium, France, United Kingdom
Surface85% asphalt, 13% gravel, 2% technical gravel (estimated mix for this plan)
Typical duration (sources)60 to 90 days for experienced cyclists riding around 70–100 km per day (one tour operator's estimate)

About the route

Planning notes

Plan your own North Sea Cycle Route plan in minutes

Enter your real distance, set surface, heat, wind and rain for each 50 km segment and get realistic riding days – plus a gear list that adapts to your conditions, water and food nearby and a safety check-in. Works offline, in English, Polish, German and Spanish.

The route in 50 km segments

Show all 145 segments
SegmentSurfaceDays (good)Days (tough)
0–50 kmAsphalt0.450.65
50–100 kmAsphalt0.450.65
100–150 kmAsphalt0.450.65
150–200 kmGravel0.550.87
200–250 kmAsphalt0.450.65
250–300 kmAsphalt0.450.65
300–350 kmAsphalt0.450.65
350–400 kmAsphalt0.450.65
400–450 kmAsphalt0.450.65
450–500 kmAsphalt0.450.65
500–550 kmGravel0.550.87
550–600 kmAsphalt0.450.65
600–650 kmAsphalt0.450.65
650–700 kmAsphalt0.450.65
700–750 kmAsphalt0.450.65
750–800 kmAsphalt0.450.65
800–850 kmAsphalt0.450.65
850–900 kmTechnical gravel0.651.14
900–950 kmAsphalt0.450.65
950–1,000 kmAsphalt0.450.65
1,000–1,050 kmAsphalt0.450.65
1,050–1,100 kmGravel0.550.87
1,100–1,150 kmAsphalt0.450.65
1,150–1,200 kmAsphalt0.450.65
1,200–1,250 kmAsphalt0.450.65
1,250–1,300 kmAsphalt0.450.65
1,300–1,350 kmAsphalt0.450.65
1,350–1,400 kmAsphalt0.450.65
1,400–1,450 kmGravel0.550.87
1,450–1,500 kmAsphalt0.450.65
1,500–1,550 kmAsphalt0.450.65
1,550–1,600 kmAsphalt0.450.65
1,600–1,650 kmAsphalt0.450.65
1,650–1,700 kmAsphalt0.450.65
1,700–1,750 kmAsphalt0.450.65
1,750–1,800 kmGravel0.550.87
1,800–1,850 kmAsphalt0.450.65
1,850–1,900 kmAsphalt0.450.65
1,900–1,950 kmAsphalt0.450.65
1,950–2,000 kmAsphalt0.450.65
2,000–2,050 kmAsphalt0.450.65
2,050–2,100 kmAsphalt0.450.65
2,100–2,150 kmGravel0.550.87
2,150–2,200 kmAsphalt0.450.65
2,200–2,250 kmAsphalt0.450.65
2,250–2,300 kmAsphalt0.450.65
2,300–2,350 kmAsphalt0.450.65
2,350–2,400 kmAsphalt0.450.65
2,400–2,450 kmAsphalt0.450.65
2,450–2,500 kmAsphalt0.450.65
2,500–2,550 kmGravel0.550.87
2,550–2,600 kmAsphalt0.450.65
2,600–2,650 kmAsphalt0.450.65
2,650–2,700 kmAsphalt0.450.65
2,700–2,750 kmAsphalt0.450.65
2,750–2,800 kmAsphalt0.450.65
2,800–2,850 kmAsphalt0.450.65
2,850–2,900 kmGravel0.550.87
2,900–2,950 kmAsphalt0.450.65
2,950–3,000 kmAsphalt0.450.65
3,000–3,050 kmAsphalt0.450.65
3,050–3,100 kmAsphalt0.450.65
3,100–3,150 kmAsphalt0.450.65
3,150–3,200 kmAsphalt0.450.65
3,200–3,250 kmGravel0.550.87
3,250–3,300 kmAsphalt0.450.65
3,300–3,350 kmAsphalt0.450.65
3,350–3,400 kmAsphalt0.450.65
3,400–3,450 kmAsphalt0.450.65
3,450–3,500 kmAsphalt0.450.65
3,500–3,550 kmTechnical gravel0.651.14
3,550–3,600 kmAsphalt0.450.65
3,600–3,650 kmAsphalt0.450.65
3,650–3,700 kmAsphalt0.450.65
3,700–3,750 kmAsphalt0.450.65
3,750–3,800 kmGravel0.550.87
3,800–3,850 kmAsphalt0.450.65
3,850–3,900 kmAsphalt0.450.65
3,900–3,950 kmAsphalt0.450.65
3,950–4,000 kmAsphalt0.450.65
4,000–4,050 kmAsphalt0.450.65
4,050–4,100 kmAsphalt0.450.65
4,100–4,150 kmGravel0.550.87
4,150–4,200 kmAsphalt0.450.65
4,200–4,250 kmAsphalt0.450.65
4,250–4,300 kmAsphalt0.450.65
4,300–4,350 kmAsphalt0.450.65
4,350–4,400 kmAsphalt0.450.65
4,400–4,450 kmAsphalt0.450.65
4,450–4,500 kmGravel0.550.87
4,500–4,550 kmAsphalt0.450.65
4,550–4,600 kmAsphalt0.450.65
4,600–4,650 kmAsphalt0.450.65
4,650–4,700 kmAsphalt0.450.65
4,700–4,750 kmAsphalt0.450.65
4,750–4,800 kmAsphalt0.450.65
4,800–4,850 kmGravel0.550.87
4,850–4,900 kmAsphalt0.450.65
4,900–4,950 kmAsphalt0.450.65
4,950–5,000 kmAsphalt0.450.65
5,000–5,050 kmAsphalt0.450.65
5,050–5,100 kmAsphalt0.450.65
5,100–5,150 kmAsphalt0.450.65
5,150–5,200 kmGravel0.550.87
5,200–5,250 kmAsphalt0.450.65
5,250–5,300 kmAsphalt0.450.65
5,300–5,350 kmAsphalt0.450.65
5,350–5,400 kmAsphalt0.450.65
5,400–5,450 kmAsphalt0.450.65
5,450–5,500 kmAsphalt0.450.65
5,500–5,550 kmGravel0.550.87
5,550–5,600 kmAsphalt0.450.65
5,600–5,650 kmAsphalt0.450.65
5,650–5,700 kmAsphalt0.450.65
5,700–5,750 kmAsphalt0.450.65
5,750–5,800 kmAsphalt0.450.65
5,800–5,850 kmAsphalt0.450.65
5,850–5,900 kmTechnical gravel0.651.14
5,900–5,950 kmAsphalt0.450.65
5,950–6,000 kmAsphalt0.450.65
6,000–6,050 kmAsphalt0.450.65
6,050–6,100 kmGravel0.550.87
6,100–6,150 kmAsphalt0.450.65
6,150–6,200 kmAsphalt0.450.65
6,200–6,250 kmAsphalt0.450.65
6,250–6,300 kmAsphalt0.450.65
6,300–6,350 kmAsphalt0.450.65
6,350–6,400 kmAsphalt0.450.65
6,400–6,450 kmGravel0.550.87
6,450–6,500 kmAsphalt0.450.65
6,500–6,550 kmAsphalt0.450.65
6,550–6,600 kmAsphalt0.450.65
6,600–6,650 kmAsphalt0.450.65
6,650–6,700 kmAsphalt0.450.65
6,700–6,750 kmAsphalt0.450.65
6,750–6,800 kmGravel0.550.87
6,800–6,850 kmAsphalt0.450.65
6,850–6,900 kmAsphalt0.450.65
6,900–6,950 kmAsphalt0.450.65
6,950–7,000 kmAsphalt0.450.65
7,000–7,050 kmAsphalt0.450.65
7,050–7,100 kmAsphalt0.450.65
7,100–7,150 kmGravel0.550.87
7,150–7,200 kmAsphalt0.450.65
7,200–7,250 kmAsphalt0.450.65

FAQ

How many days does it take to bikepack North Sea Cycle Route?

With BikepackPilot's default pace of 110 km per day on asphalt, the 7,250 km route takes about 68.3 riding days in good conditions and about 99.7 days with moderate headwind and light rain, using the surface mix shown on this page. Rest days are not included.

How long is North Sea Cycle Route?

about 7,250 km on the current official EuroVelo listing (older sources say about 6,000 km or 5,942 km), from Bergen, Norway (circuit; start point is arbitrary) to Bergen, Norway (circuit; the route links to Orkney and Shetland, with a ferry to Norway).

What surface is North Sea Cycle Route?

For this plan we assume 85% asphalt, 13% gravel, 2% technical gravel (estimated mix for this plan). In BikepackPilot you set the surface for each 50 km segment yourself.

Sources

  1. EuroVelo 12 – North Sea Cycle Route (official EuroVelo site)
  2. EV12 North Sea Cycle Route – Wikipedia
  3. North Sea Cycle Route – Germany Travel
  4. EuroVelo 12 – VeloPlanner

More route plans